So, what are we up to for 2016?

Happy New Year! This is our schedule for 2016, at least in terms of the big items

1. W/c 18Jan: begin work on weeding out the teething issues with the website, for example spelling mistakes, formatting issues, API issues, etc. kelsey did an awesome job to get us launched before the xmas break but it did mean that we havent had an opportunity to address these things, but dont worry – we will get to it

2. Late Jan/early Feb: stainless run scheduled in production for the new two hole tips (that match our very well received four hole tip). When i think of how much we have improved the tip since we launched the L1 it is quite incredible. back then they were chrome plated brass and not the best design in terms of milk texturing performance. i am super happy with the design of the four hole tip that we now have and this will not be changing going forward. it has reached a steady state.

3. Enhancement kit for the L1: i had hoped to release this in January, but it is going to be March i’m afraid. The reason for this is simple the lead time on the new pump which was ordered in December, but will not be available for despatch until March. The rest of the kit (pipe work and secondary pressure switch and manifold and wiring) will be ready in January but i think it is silly to release the kit without the pump in January, and then have customers tell us what we already know, which is ooh its nice but it makes the pump rather more noisy than it used to be doesnt it? And then have then incur a second shipping charge in March in order to received the more refined pump. So as annoying as it is, March it has to be for this exciting release

4. The LONDINIUM Manual (LM): when items 1 to 3 above are complete we will begin work on this project in earnest and it is pretty exciting as it is a ground up development

All in all we are really looking forward to a super year ahead