UPDATE: 10 JUL 21
the little londinium is not going to follow a drip fed release to market approach, unlike most of our previous models
the 4 pre-production units will be assembled and tested, revised if necessary, and then signed off into production
the production components will then be produced and the machines will be assembled and the product will then be made available for purchase on our web store
one thing is cerain the news will break here first, rather than any social media platform
UPDATE: 3 JUL 21
the UK foundry have not delivered us the 4 sample lever groups for sign off into production, something we expected in May
we now have all the other components in house and there is nothing more for us to do other than wait
i am told by those experienced in dealing with foundries that it is a bit of a feature of the industry, but its frustrating none the less
there isnt much else to say as we have now taken all the project steps that are within our control as far as we can (boiler, portafilter, heating element, valves, seals, frame, power leads, packaging, etc, etc)
our suspicion is we may not receive the lever group until august 15
the only good news is when it does finally arrive we should be able to move quickly to assemble it
————————-
we remain on target to get a pre-production sample together this month, june
that isnt a guarantee that it will happen, but nothing has occurred yet which will prevent it from happening either
some people are taking some well earned holidays this week and on their return we will start putting pieces together
elements, seals, boiler, sheet metal fabrications are all very much in hand; the lynch pin in this project is the all new compact 58mm spring lever group which is a gem
rapid prototyping takes you so far, but it isnt until you screw all the real pieces together that you can see for sure how it performs
we’re also looking to ship it with polystyrene free packaging as we feel we can do better in this area
kind regards
reiss.